The Problem

VolkerFitzpatrick Colas JV, CH2M HILL Halcrow, Norder Designs Associates Limited and Birmingham City Council faced huge challenges on the North Airfield drainage facility, A45 Works and Runway Extension.

Our Solution

APS supplied bespoke package Pumping Stations, Valve Chambers, Control Panels, Standby Generators, installation of pumps and pipework into pre-cast 10m deep concrete pump wells. The runway works had to be installed during the night and included the installation of a 4m diameter GRP package pumping station incorporating 250mm internal pipework.

yeovilton
previous
case study

As industry leaders in package pumping stations, submersible pumps, pump installations and attenuation and fluid storage systems for waste-water, chemicals and storm-water.