Following the prestigious visit of Barack Obama for the G20 Summit, Celtic Manor have invested £100 million into their International Convention Centre.
All Pump Solutions were partners of choice, and designed, supplied, installed and commissioned two 125,000 litre foul storage pumping stations fitted with Flygt pumps, pumping at 30 litres/second. Celtic Manor can rest assured that the operation of the pumping stations is closely monitored by APS engineers 24/7.